About Roytec

One subcontractor for the whole façade.

We design, supply and install the building envelope as a single accountable specialist — closing the gap between design and site that costs main contractors time, money and certainty. A decade of façade-design heritage stands behind every package we deliver.

2015

Founded

100+

Projects delivered

£5M

PI cover

70%

Repeat business

Design-led

Design is where Roytec is strongest.

Roytec began as a design house — for over a decade we drew and engineered façade packages for some of the UK's largest cladding subcontractors. That design capability isn't an add-on to the build; it's the foundation the whole company is built on, and still our deepest, most experienced team.

3D BIM model of a façade junction, engineered by Roytec's design team

A decade of design heritage

Ten years drawing façades for other subcontractors gave us a design library and a depth of detailing most installers simply don't have.

Engineered before it's built

Every package is designed, coordinated and reviewed in-house before a panel is ordered — so the build follows the drawing, not the other way round.

Design ahead of the BSR

We're engaged on many projects purely for design — producing the façade engineering and documentation main contractors need ahead of Building Safety Regulator (BSR) Gateway submissions on higher-risk buildings.

Where we work

Envelopes for every building type.

The building types we design, supply and install across.

40 Broadway commercial façade

Sector

Commercial offices

High-specification commercial façades for City and West End locations — coordinated against complex MEP, delivered to tight programmes and exacting aesthetic standards.

20+ projects · rainscreen · curtain wall

St Mark's Square residential tower, Bromley

Sector

Residential

Mid-rise residential from townhouses to 10-storey blocks. Building Safety Act documentation for higher-risk buildings, EWS1 context and Part L compliance built in.

25+ projects · new-build & refurb

Curtain House heritage refurbishment

Sector

Heritage & conservation

Conservation-area and listed-building work — collaborating with conservation officers and matching traditional materials, with modern performance behind a period façade.

8+ projects · period aesthetics

What we stand for

Three things we don't compromise on.

01

Ownership

One subcontractor, one responsibility.

Ownership

We take responsibility for the whole envelope — design through to install — so nothing falls through the seam between drawing board and site.

02

Precision

The detail you tender is the detail you get.

Precision

Every façade is drawn, coordinated and reviewed by our experienced cladding team before it reaches site — checked by specialists, not waved through.

03

Partnership

Around 70% of our work is repeat business.

Partnership

We build long relationships, not one-off packages — because we behave like part of your team, not a risk on your programme.

Our story

From a design desk to a build on site.

2015

Roytec is incorporated

Founded as a façade design house, drawing cladding and curtain-wall packages for some of the UK's largest cladding subcontractors.

2015–22

100+ façades designed

A decade of design heritage builds up across the country — over a hundred envelopes drawn, detailed and issued.

2022

Into Design, Supply & Install

Roytec takes the next step: delivering complete façade packages end to end, closing the seam between the drawing and the build.

Curtain House, Shoreditch

2025

Curtain House — first major DSI project

Curtain House in Shoreditch — a Grade-context refurbishment delivered as a full Design-Supply-Install package, and proof the model works on site.

8 Lancelot Place, Knightsbridge

2025

8 Lancelot Place

A high-specification residential envelope in Knightsbridge — design and install under one responsibility.

St Mark's Square, Bromley

2025

St Mark's Square, Bromley

Remediation of all 142 balconies on an occupied Bromley high-rise — rebuilt from scratch in 3D, with all engineering in-house, then installed over 22 continuous weeks.

Today

100+ projects, 70% repeat

Façade design across the whole UK; full Design-Supply-Install builds in London and the South East — most of it repeat business from the same main contractors.

The team

The key people behind your façade.

A senior leadership team backed by an experienced cladding crew who design, review and deliver every façade. Hover a face to read more.

JA

20 years in façades across the UK and Europe. Founded Roytec in 2015 and leads the business — from its façade-design heritage to full Design, Supply & Install delivery.

Jurij Avizen

Managing Director

NS

Around 15 years in façades, risen through site supervision to lead Roytec's on-site delivery — installation, programme, sequencing and site safety.

Nick Schiau

Construction Director

ZS

Around 30 years in building-envelope design — MSc in Façade Engineering (Bath), MSFE and CIBSE. Leads Roytec's technical design, façade engineering and BIM.

Zoltan Szaip

Technical Director

Health & safety

Safety as a design discipline, not a folder.

A façade carries real risk — at height, in fire, and over decades of service. Expand each point to see how we handle it.

Safety starts at the drawing board. We design out risk under our CDM 2015 designer duties — buildability, access, working-at-height and maintenance are resolved on the model, not improvised on site.

For higher-risk buildings we work to the Building Safety Act regime: the golden thread of information, clear fire-performance documentation, and the evidence a Principal Contractor needs to discharge their duties.

Our installation teams work to method statements and risk assessments tailored to each project, with the right access, PPE and supervision. We coordinate with your Principal Contractor, not around them.

Our systems are checked by people who aren't us: SSIP for safety in procurement, ISO 9001 for quality management, Constructionline as a verified supplier, and CWCT standards for façade testing.

Sustainability

The most sustainable façade is the one designed well.

No grand claims — just the practical work that adds up over a building's whole life. Expand each point for detail.

The biggest carbon a façade saves is the energy a building doesn't waste. We model thermal performance, condensation risk and air-tightness from the start, so Part L compliance is engineered — not patched in after the fact.

A façade that has to be replaced early is the least sustainable outcome there is. We specify systems and details for genuine service life, with maintenance and replacement designed to be achievable rather than disruptive.

We coordinate material choices from the model — reducing waste through accurate setting-out and off-site fabrication, and helping main contractors evidence the responsible sourcing their clients increasingly require.

One team for the whole envelope.

One subcontractor, one responsibility — we aim to reply within two working days.