Roytec-delivered building envelope at Axtell House, Warwick Street, London W1

We design it. We build it. Zero lost in translation.

Cladding Design, Supply & Install for main contractors, architects, consultants and subcontractors who can't afford delays.

70% repeat business100+ façade projects10+ years

The problem

Complex cladding packages shouldn't delay your programme.

Aluminium rainscreen junction detail at Curtain House
Where complex façades fail — the interfaces between trades.
01

Missing coordination details

They surface on site as your delay, your rework, your problem.

02

Over-promising on programme

Promises that evaporate the moment you're relying on them.

03

Quality that slips

Defects that land on your snag list, not theirs.

04

Lost in translation

Design intent lost between consultant and installer — and it bites at handover.

Every one of these is a coordination failure — and coordination is the job we actually do. See how Roytec closes the gap.

Recent work

Design, supply & install — delivered end to end.

Why Roytec

We've delivered 100+ façade projects for our clients — with around 70% repeat business.

We started in 2015 designing façades for the UK's biggest cladding subcontractors — drawing thousands of panels and solving the coordination headaches that make or break a project. Design is still our strongest department: we now deliver the full package ourselves, and we're engaged on many projects for design alone — producing the façade engineering project teams need ahead of Building Safety Regulator (BSR) Gateway submissions. When design and installation sit under one roof, nothing gets lost in translation.

Design in motion

From the model to the manufactured façade.

Systems we work with

EquitoneRockpanelPREFASotech OptimaNvelope (SFS)ValcanMechslip (Ash & Lacy)Schüco

How we work

One team, one responsibility, one outcome.

01

Design

Coordinate with your design team, develop buildable details, ensure compliance. Full BIM models, thermal analysis, specification.

02

Procure

Source materials to programme, manage fabrication partners, maintain quality control throughout manufacturing.

03

Install

Experienced, qualified installation teams. Daily progress monitoring and reporting. Coordination with interfacing trades.

04

Handover

Final inspections, O&M manuals, as-built drawings, warranty and Building Safety Act golden-thread package.

Your risk, removed

The four things that sink a cladding package — and how we kill each one.

Gaps between separate façade packages

We take the whole envelope as one package — no seam between trades for a dispute to live in.

Programme slip on the critical path

Clashes identified before construction, not during.

Building Safety Act golden-thread gaps

Golden-thread documentation handed over where required by the appointment.

A sub who can't carry the package

£200K–£1.4M+ envelopes designed, supplied and installed.

Services

Façade capability, end to end.

Design, Supply & Install

Full D&B packages from technical design through installation and handover. One team, one responsibility.

Cladding Design

The full Stage 5–6 design package — approval drawings through production, schedules and as-builts. 100+ projects since 2015.

Pre-Construction Façade Design (PCSA)

Façade design through RIBA Stage 3–4 to Building Control / BSR Gateway approval — before the package is let.

BIM Modelling

BIM-native design, clash detection, coordination of federated models, and golden-thread documentation.

Façade Consultancy

Independent advice and on-site investigation — catching issues while there's still access to fix them.

Accredited & assured

Commercially and safety-assured — cleared for façade packages up to £5M.

Our accreditations aren't badges for a tender — they're how a main contractor knows we can carry the package: financially pre-qualified, quality-managed, and safe on site.

ISO 9001:2015

Quality management, independently audited every year.

Constructionline Gold

Commercially and financially pre-qualified.

SSIP

Health & safety certified — Safety Schemes in Procurement.

CWCT

Centre for Window & Cladding Technology — the façade industry standard.

£5M PI / £10M PL

Professional indemnity and public liability cover.

One subcontractor. One responsibility.

Awarding a façade package?

Send us your tender — one team designs, supplies and installs the whole façade, with clashes caught in BIM, not on your critical path. We aim to reply within two working days.